Below are a few examples of some of the projects and contracts we have undertaken.
RMB Ford Northallerton
This construction of the new Ford showroom in Northallerton was completed in 2013. The project was a rapid construction in which the walls were constructed from insulated concrete forms (Polystyrene blocks filled with concrete). Then rendered and clad on the outside and plasterboarded on the inside. The project from start on site to completion was just 16 weeks.
Gaza Sub Station
These photographs show the construction of a substation at Gaza Barracks, Catterick at various stages. As can be seen there was significant reinforcement required for the structural concrete walls due to the projects high specification to be met. These works were carried out for Carillion plc.
Hospitals
Acomb Construction have carried out extensive works at Darlington Memorial Hospital over the years. These works have included full refurbishments of the high dependency unit, several ward refurbishments and providing new office and conference facilities to a consistently high standard
Barn Conversion - Low Wathcote
These barns were resurrected from a state of dereliction to traditional barn conversions. These images show the contrast between the barns at the beginning of the contract and the barns in their completed form.
Railway Cottages - Bowes Moor
This project consisted of restoring and renovating 2 derelict properties. The distinction between the properties in their original state and on compeltion can be seen in the below photographs.
Schools
Acomb Construction Ltd has carried out a number of contracts at various schools throughout the region and surrounding areas. Hipswell CE Primary School has recently been extended to provide additional admin facilities. At Risedale Community College works have ranged from the Youth Centre refurbishment and revamping of the schools changing rooms to a new school reception area.
A number of contracts have also been carried out at the new Darlington Education Village, including a new learning support area as well as various other contracts within the school and its neighbouring Harrowgate Hill Primary School.
Robertson Road Sports Pavilion - Client Atkins
This was a refurbishment of the external facade of the sports pavilion on Robertson Road in Catterick Garrison. The photographs below clearly show the improvements between the original building and the building on completion.
Ovington Granary
The works carried out here were a total renovation of the derelict granary into an exclusive private dwelling and a refirbishment of the game keepers cottage.
Vimy Barracks Troop Shelters
These photographs show the work carried out to construct the troop shelter. THis contract was carried out throughout 2007 and consisted of 2 buildings.
Churches
Acomb Construction Ltd has carried out works at several churches throughout the region. These works have included amongst others a major revamp of Masham Methodist Church. Renovaton works at Spennithorne and Grewelthorpe Churches and Restoration works at St Mary's Church, Richmond.